India #2 – 810 MW CCGT

Combined cycle gas turbine • 2x GE 9FA.03 configuration • Active GE service contract

⚙️ Service Supported

810 MW combined cycle power plant with active GE service contract until 2028. Two GE 9FA.03 gas turbines with comprehensive OEM support. Operating hours range: 1,547–2,790 hours across units.

Plant Specifications

810
MW Capacity
2
Gas Turbines
CCGT
Technology
2028
Service Until
Preserved
Status

Technical Specifications

Plant Capacity810 MW
TechnologyCombined Cycle Gas Turbine
Gas Turbines2x GE 9FA.03
Configuration2x405 MW at ISO conditions
Operating Hours1,547–2,790 hours
Service ContractGE until 2028
StatusPreserved condition
FuelNatural Gas
Control SystemGE Mark VI
Grid ConnectionHigh voltage transmission

Plant Configuration

Gas Turbines2x GE 9FA.03
Steam TurbinesCombined cycle configuration
Heat RecoverySteam Generators (HRSG)
GeneratorsSynchronous generators
Control SystemGE Mark VI DCS
Cooling SystemCooling towers
Water TreatmentComplete WTP facility
ElectricalHigh voltage switchyard
AuxiliariesComplete support systems

Key Documents

  • 📄
    810MW CCPP Overview
    Combined cycle power plant details
  • 🔧
    2x 405MW at ISO Conditions
    Technical specifications
  • ⚙️
    GE Service Contract
    OEM support agreement until 2028
  • 🏭
    Plant Layout Drawings
    Site configuration and arrangement
  • 🔍
    Equipment Condition Report
    Current operational status
  • 📋
    Operating Hours Log
    Unit-specific operating history

Service & Support

GE Service Contract

  • Active contract until 2028
  • OEM parts and service support
  • Technical advisory services
  • Scheduled maintenance programmes
  • Emergency response capability
  • Performance optimisation
  • Remote monitoring services

Operational Features

  • Dual 405 MW units at ISO conditions
  • GE Mark VI control system
  • High availability configuration
  • Comprehensive auxiliary systems
  • Modern environmental controls
  • Grid stability support features
  • Flexible operation capability

Investment Considerations

✅ Key Advantages

  • 810 MW proven capacity
  • Active GE service contract until 2028
  • Modern GE 9FA.03 technology
  • Professional preservation programme
  • Comprehensive documentation

⚠️ Due Diligence Items

  • Service contract transferability
  • Unit-specific operating history review
  • Decommissioning and relocation planning
  • Regulatory compliance verification
  • Behind-the-meter integration assessment