← Back to Portfolio
🇮🇳 India

India #1 – Samalkot 1,500 MW

Combined cycle gas turbine • Andhra Pradesh • 6x GE 9F.03 configuration

🏭 Large Scale CCGT

1,500 MW combined cycle power plant. Six GE 9F.03 gas turbines in preserved condition. Located in Samalkot, Andhra Pradesh. Established from 2011 onwards with comprehensive industrial infrastructure.

Plant Specifications

1,500
MW Capacity
6
Gas Turbines
CCGT
Technology
2011+
Vintage
Preserved
Status

Technical Specifications

Plant NameSamalkot CCGT
Capacity1,500 MW
TechnologyCombined Cycle Gas Turbine
Gas Turbines6x GE 9F.03
ConfigurationMulti-shaft CCGT
LocationSamalkot, Andhra Pradesh
Commissioning2011 onwards
StatusPreserved condition
FuelNatural Gas
Grid ConnectionHigh voltage transmission

Plant Configuration

Gas Turbines6x GE 9F.03
Steam TurbinesMulti-stage configuration
Heat RecoverySteam Generators (HRSG)
GeneratorsSynchronous generators
Control SystemAdvanced plant control
Cooling SystemIndustrial cooling towers
Water TreatmentComplete WTP facility
ElectricalHigh voltage switchyard
AuxiliariesComplete support systems

Key Documents

  • 📄
    1500MW Gas CCGT Overview
    Combined cycle power plant details
  • 🔧
    India #1 Technical Specification
    1,500MW plant detailed specifications
  • 🏭
    Plant Layout Drawings
    Site configuration and arrangement
  • Electrical System Design
    Power evacuation and grid connection
  • 🔍
    Equipment Condition Report
    Current preservation status
  • 📋
    Operational Records
    Historical performance data

Location & Infrastructure

Site Advantages

  • Strategic location in Andhra Pradesh
  • Established industrial infrastructure
  • High voltage grid connectivity
  • Natural gas pipeline access
  • Skilled local workforce available
  • Port connectivity for logistics
  • Regulatory framework established

Technical Features

  • Multi-shaft CCGT configuration
  • Advanced heat recovery systems
  • Comprehensive control systems
  • Industrial cooling infrastructure
  • Complete water treatment facility
  • Modern electrical switchyard
  • Environmental control systems

Investment Considerations

✅ Strategic Advantages

  • Large-scale 1,500 MW capacity
  • Proven GE 9F.03 technology
  • Professional preservation programme
  • Complete industrial infrastructure
  • Established grid connectivity

⚠️ Due Diligence Focus

  • Equipment condition assessment
  • Regulatory compliance status
  • Decommissioning logistics planning
  • Environmental clearance requirements
  • Behind-the-meter integration potential