India #1 – Samalkot 1,500 MW
Combined cycle gas turbine • Andhra Pradesh • 6x GE 9F.03 configuration
🏭 Large Scale CCGT
1,500 MW combined cycle power plant. Six GE 9F.03 gas turbines in preserved condition. Located in Samalkot, Andhra Pradesh. Established from 2011 onwards with comprehensive industrial infrastructure.
Plant Specifications
1,500
MW Capacity
6
Gas Turbines
CCGT
Technology
2011+
Vintage
Preserved
Status
Technical Specifications
| Plant Name | Samalkot CCGT |
| Capacity | 1,500 MW |
| Technology | Combined Cycle Gas Turbine |
| Gas Turbines | 6x GE 9F.03 |
| Configuration | Multi-shaft CCGT |
| Location | Samalkot, Andhra Pradesh |
| Commissioning | 2011 onwards |
| Status | Preserved condition |
| Fuel | Natural Gas |
| Grid Connection | High voltage transmission |
Plant Configuration
| Gas Turbines | 6x GE 9F.03 |
| Steam Turbines | Multi-stage configuration |
| Heat Recovery | Steam Generators (HRSG) |
| Generators | Synchronous generators |
| Control System | Advanced plant control |
| Cooling System | Industrial cooling towers |
| Water Treatment | Complete WTP facility |
| Electrical | High voltage switchyard |
| Auxiliaries | Complete support systems |
Key Documents
-
1500MW Gas CCGT Overview
-
India #1 Technical Specification
-
Plant Layout Drawings
-
Electrical System Design
-
Equipment Condition Report
-
Operational Records
Location & Infrastructure
Site Advantages
- Strategic location in Andhra Pradesh
- Established industrial infrastructure
- High voltage grid connectivity
- Natural gas pipeline access
- Skilled local workforce available
- Port connectivity for logistics
- Regulatory framework established
Technical Features
- Multi-shaft CCGT configuration
- Advanced heat recovery systems
- Comprehensive control systems
- Industrial cooling infrastructure
- Complete water treatment facility
- Modern electrical switchyard
- Environmental control systems
Investment Considerations
✅ Strategic Advantages
- • Large-scale 1,500 MW capacity
- • Proven GE 9F.03 technology
- • Professional preservation programme
- • Complete industrial infrastructure
- • Established grid connectivity
⚠️ Due Diligence Focus
- • Equipment condition assessment
- • Regulatory compliance status
- • Decommissioning logistics planning
- • Environmental clearance requirements
- • Behind-the-meter integration potential